Monday, February 4, 2008
Friday, November 30, 2007
Hello From the Constructions Site
The first floor front section is complete. I tested the chandeliers by sticking the ends of the wire in a small 3 Volt battery box. I was afraid that the connection might have broken or something, but at least these two are fine for now! I am putting in floor and ceiling molding to hide the edges. However, you might have seen that where the walls meet vertically, especially in the bay window area, there is a noticeable gap. I am hoping it will become less obvious when I seal the edges from outside. And finally, the curtains I put in will cover the edges anyway.




Posted by
Sumaiya Mehreen
at
7:18 AM
0
comments
Wednesday, November 28, 2007
Windows & Walls

I love the frames! I wish I could afford the working windows, but ... Oh Well! A few of the inner walls (2nd and 3rd floor) are yet to be papered. I had bought 4 yards of fabric: just to be on the safe side. I bought upholstery-grade fabric, which was more expensive than regular cotton; but I was really looking for something with a slight sheen, and cotton was just not doing it!
Posted by
Sumaiya Mehreen
at
12:00 AM
0
comments
Monday, November 12, 2007
Dry Fitting
The major walls are complete. Next step: wallpaper smaller walls and add interior trims; add wall sconces and power outlets; glue when everything is finalized.
Posted by
Sumaiya Mehreen
at
11:05 PM
0
comments
A Setback Due To Botched Schematics!

I couldn't believe my eyes when I tried to dry fit the walls on Saturday! As soon as I reached step 2 of wall assembly, I hit a major snag. Apparently, the diagram of the left wall (on sheet 11) was labeled incorrectly. As a result, there was a strip of exposed slots right under the ceiling.
So I had to redo the first floor wallpaper as well as fix the bottom part of the second floor. Note to self: contact Greenleaf and ask them to make the changes on their diagrams!Some valuable tips I learned from this quandary:
- Do not paste the entire fabric to the wall if possible. Glue only along edges, so that if and when you need to pull out the fabric, it is easier to remove.
- Dry fit the parts before wallpapering to make sure the schematics are correct.
- Buy extra fabric ~ because chances are, mistakes will happen!
Posted by
Sumaiya Mehreen
at
10:58 PM
0
comments
Monday, October 29, 2007
The Floors Have Been Floored!
Finally, the floors are complete...almost! This includes wiring the ceiling lights as well as the faux wood tiles. Doesn't look like much, right? But consider this...I had to cut 1 in. square tiles out of the wood-textured Con-Tact paper, peel them and paste them in a perfect checker-board pattern. Total cost of finishing the floors is less than $15 ~ which is considerably less than what I would have to pay if I used actual wood veneers.
Posted by
Sumaiya Mehreen
at
4:36 PM
0
comments
Sunday, October 7, 2007
Chandelier Connections

After planning out where the chandeliers would go, I took out my wood-burning tool and made holes through which the chandeliers would be threaded. I also traced shallow grooves on the floor, so that the wires would lay flat, and not create bumps when I add the mosaic.
On the opposite side, which is the ceiling for the level below, you can see the chandelier's hanging. I still haven't decided what color to paint the ceiling. That will depend on the wallpaper color.
Posted by
Sumaiya Mehreen
at
9:00 AM
0
comments